Tuesday, July 14, 2009

Windsor NC

Route
I 40 East, I 440 West, US 264 East, NC 91 South, US 264 Alternate East, Local streets, NC 43 West, US 264 West, US 13 North, US 13 Business Bethel South, US 64 Alternate East, US 13 North, US 17 Bypass Windsor North, US 17 South, NC 380 East, Sans Souci Road, NC 380 East, NC 45 South, US 63 West, US 64 Business Jamesville West, US 64 West, US 13 South, US 13 Business Bethel North, US 64 Alternate West, US 64 West, I 440 West, I 40 West.

Notes
On I 795/US 264 in Wilson, the BGS for I 795 still say US 117 and for US 301 say US 117 Alternate, even though AASHTO approved the change.
NCDOT originally documented that they were going to sign mainline US 17 through Windsor as a Business Route. However, when they made their request to AASHTO, they asked for it be an Alternate Route. However, signage in the field has the original mainline signed as the mainline and the new bypass has a Bypass banner.
I originally wanted to photograph and ride the Sans Souci ferry, but the last few hundred yards of the gravel road leading up to the ferry was under water. I ended up backing up the road back to the paved road in Sans Souci, because the shoulders were flooded.

Results
Bertie County, for a new total of 979.
Clinched US 264 Alternate Bethel, US 64 Business Bethel, US 64 Business Jamesville, US 17 Bypass Windsor.

Wednesday, June 24, 2009

Seattle Trip, Day 7

Route
Coeur d'Alene ID to Seattle WA: I 90 West, Local Roads in Spokane, I 405 North, WA 520 East
Notes
Results
Clinched I 90 Idaho.
Counties: Washington: 5, for a new total of 978.

Tuesday, June 23, 2009

Seattle Trip, Day 6

Route
Yellowstone to Couer d'Alene ID: Park roads: Canyon to Norris, Mammoth, North Entrance
US 89 North, I 90 West
Notes
I 90 is under construction on the multiplex with I 15 in Butte MT and from Missoula MT west.
Every pass in MT and ID have Chain Up and Chain Removal areas for installing tire chains in winter.
Results
New state visited: Montana, for a new total of 44.
Counties: Montana: 10, Idaho: 2, for a new total of 973.

Seattle Trip, Day 5

Route
Sheridan WY to Yellowstone: I 90 West, US 14 West, US 14A West, US 14/16/20 West to Yellowstone
Park Roads: to Fishing Bridge, West Thumb, Madison, Norris, Canyon
Notes
US 14 is under construction to straighten it out at the top of the Big Horn climb.
Madison to Norris in Yellowstone is under construction with delays and closed at night.
Results
Clinched US 14 Alternate, Cody WY

Sunday, June 21, 2009

Seattle Trip, Day 4

Route
Rapid City SD to Sheridan WY: I 90 West, I 190 South, local roads, US 16 West, US 16 Alternate West, SD 244 West to Mt Rushmore
SD 244 East, US 16 Alternate West, SD 743 West, SD 87 West, US 16 West, I 90 West to Sheridan WV
Notes
US 16 from Rapid City to Custer SD has been significantly upgraded over the years. The Truck route east of town is hardly needed except to keep the largest trucks off a few blocks in downtown Rapid City.
There are gates on US 16 and I 90 for closing the highways with warning signs.
Results
Counties: Wyoming, Sheridan, for a new total of 961.

Saturday, June 20, 2009

Seattle Trip, Day 3

Route
Council Bluffs IA to Rapid City SD: I 29 North, SD 50 West, SD 50 Business West to Vermillion SD.
SD 50 Bus East, SD 50 East, I 29 North, I 90 West, I 90 BL (Mitchell) West, I 90 West to Rapid City SD.
I 90 West, I 190 South, local roads, US 16 East, I 190 North, I 90 East
Notes
Construction on I 29 and I 90 for long stretches with two way traffic on one side and no pavement left on the other at all.
Stopped for gas in Mt Vernon SD. Stopped a crossroad a half mile north of I 90 signed "Hwy 16". This would be old US 16 from before it was replaced by I 90 and truncated to Rapid City SD.
Results
Clinched I 29 in IA, I 90 Business Mitchell SD.
Counties: Iowa: 3, South Dakota: 3, for a new total of 960.

Seattle Trip, Day 2

Route
Evansville IN to Council Bluffs IA: US 41 North, I 64 West, I 70 West, Local Streets (Downtown St Louis), I 70 West, MO 19, Local Road, MO 167, I 70 West, I 435 North, I 29 North, I 229 North, I 29 North, IA 2 West, NE 2 West, US 75 Bus North to Nebraska City NE, US 75 Bus South, NE 2 East, IA 2 East, I 29 North to Council Bluffs IA

Notes
At the rest area on I 64 just before the I 57 interchange, there were construction fliers for the "rubblization" of a section of I 57 south of I 64, They're ripping up the entire pavement and pulverizing it.
The detour for I 64 through St Louis is very well marked and warned. There is no indication of construction or sign changing at the I 70/US 40/61/Future I 64 interchange west of St Louis.
There are full color shields painted on the pavement for the I 270 exit from I 70 in Kansas City.
I 35 is under construction from I 70 to I 29. I 435 is given as a detour for both I 35 and I 29 North. I 435 has I 35 shields with orange alt banners posted along that part of the detour, but not such shields for I 29.
I 29 is reduced to two way traffic on the north bound lanes for several long stretches in Iowa.
Results
Clinched I 64 in IN and IL, I 229 in MO.
Counties: Indiana: 1, Illinois: 5, Missouri: 5, Nebraska: 1, Iowa: 2, for a new total of 954.

Seattle Trip, Day 1

Route
Chapel Hill NC to Evansville IN: I 40 West, I 85 West, I 73 North, I 40 West, US 52 North, I 74 West, I 77 West, I 64 West, I 264 West, I 64 West, US 41 South to Evansville IN
US 41 North, I 64 East, I 164 South, Local Streets, IN 62 East, US 41 North

Notes
Sign changing continues on Greensboro interstates. The ramp from I 85 to I 73/US 421 is labeled US 421 North. The Wendell Ave exit number is now using I 73 mileage. The exit for I 40 from I 73/US 421 has Blue 40 shields, but uses both I 40 and I 73 mileage.

Construction continues on the new I 60 bridge west of Charleston WV. No tie ins to I 64 yet.

Major construction on I 64 in Indiana, Two way traffic on the east bound lanes. Construction at the end of I 164 at the US 41 interchange.

Results
Clinch I 64 in WV, I 164 in IN.
Counties: Kentucky: 9. Indiana: 9, New total = 940.

Wednesday, June 10, 2009

Wrightsville Beach and Oak Island

Route
I 40 East, US 74 East to Wrightsville Beach
US 74 West, US 76 West, NC 132 South, US 421 South, Fort Fisher-Southport Ferry, NC 211 North, Local roads, NC 211 North, NC 133 South to Oak Island
NC 133 North, US 421 North, I 140 East, I 40 West

Notes
There are ALT ROUTE banners on I 40 shields on NC 24 at the bottom of the ramps from I 40 pointing east. I assume they are for hurricane evacuation routes.

The second bridge to Oak Island is under construction. There was an accident there last winter that stopped construction, but a lot has been done since my last visit in October 2007. What is done is the approach ramp on Middleton south from Oak Island Boulevard, support towers and pieces of deck and deck supports.


There are read and blue I 140 shields painted on the pavement in the exit lane from US 421/17 to I 40/US 17. Colored shields are very rare on pavement.

Results

Tuesday, April 14, 2009

Appomattox Va

Route
NC 86 North, I 85 North, US 15 North, US 15 Truck Oxford North, US 158 Business Oxford East, US 15 North, US 15 Business Farmville North, US 460 West, US 29 South, US 29 Business Alta Vista South, US 29 South, US 29 Business Gretna South, US 29 South, US 29 Business Chatham South, US 29 South, NC 86 South.
Notes
This trip was to Appomattox National Historic Park. On the way up and back, I clinched some US Business routes. The US 29 Business routes are the old US 29 routing through the town. Between Alta Vista and Hurt there is a magnificent double camelback truss bridge on the Business route and a railroad bridge with the sidewalk going through a corrugated pipe. Both are worth some photography when it is not so rainy.
Results
Counties - Appomattox VA, for a new total of 921.
NC - Clinched US 158 Business Oxford.
VA - Clinched US 15 Business Farmville, US 29 Business Alta Vista,
US 29 Business Gretna, US 29 Business Chatham. Mileage on US 29, US 460, US 501.

Thursday, April 09, 2009

Villanova University Campus Visit

Route
I 85 North, I 95 North, I 395 North, I 695 North, Pennsylvania Avenue, DC 295 North, MD 219 North, Baltimore/Washington Parkway North, I 95 North, I 895 North, I 95 North, US 202 North to King of Prussia
US 202 South, N Gulph Road, PA 32 West to Valley Forge
PA 32 East, US 422 South, US 202 North to KoP
US 202 South, S Gulph Road, PA 320 South, US 30 East to Villanova University
US30 West, I 476 South, I 95 South, I 495 West, I 95 South, I 295 South, VA 36 West, I 85 South
Notes
Normally on a Sunday, the drive through DC to Baltimore on I 395, DC 295 and the Balt-Wash would be a breeze. However, this weekend was the Cherry Blossom Festival. We came to a full stop just before the Potomac River.
I 95 north of Baltimore is being totally reconstructed from I 895 through the I 695 interchange. It may be better to take I 695 over the Key Bridge to miss the construction.
The sign gantries on US 202 in Delaware are painted a very dark grey, almost black, an odd color choice.
US 202 is divided in Delaware with businesses in the median. There is a wide shoulder on the left for exitting to the businesses.
I saw my first jughandle on US 202 in Pennsylvania. It was a standard reverse jughandle, looking much like a cloverleaf. The second was a forward jughandle just west of the Pennsylvania Turnpike, which we used to get to the hotel between the King of Prussia Mall and the Turnpike. To get to the hotel from US 202 eastbound, we drove pastthe hotel across the Turnpike, right on the jughandle, left on a sideroad, then left on US 202 westbound, back across the Turnpike to the hotel.
We saw two interesting signs not often followed: "Road Construction: Headlights on" in Pennsylvania. "Turn off Windshield Wipers" in Delaware Turnpike and Maryland JFK Highway tollbooths.
The toll for the Susquehanna Bridge is $5, eastbound only.
I 495 is being reconstructed around the Dulles toll road and I 66 interchanges.
Results
States - Delaware, for a new total of 43.
Counties - New Castle DE, Cecil MD, Harford MD, Montgomery MD, for a new total of 914.
VA - Clinched I 495.
DC - Clinched I 695.
MD - Clinched I 95, I 495, I 895.
DE - Clinched I 95. Mileage on US 202.
PA - Mileage on I 95, I 476. Mileage on US 30, US 202, US 322, US 422, PA 320.

Sunday, January 04, 2009

Augusta GA - Christmas

Route
I 40 West, I 85 South, I 77 South, SC 277 South, I 20 West to Augusta
GA 28, I 20, GA 104, GA 337, Local Roads
I 20 East, SC 277 North, I 77 North, I 85 North, I 40 East to Chapel Hill
Notes
The BGS's on I 40 West at the old Business Route split now have I 40 and I 85 splitting and I 40 Business is gone. However, the reassurance shields on I 85 and the BGS's in both directions at the I 85/I 73 split have I 40 West.
Just north of the I 20/I 520 interchange, a new double trumpet interchange has been built for Scott Nixon Road to cross the Bobby Jones ( GA 232 ). Construction of this interchange and the moving of the access road for I 20 have caused a couple of motels and a skating rink to be demolished. The Sam's Club has lost a quarter of its parking lot.
Results

Friday, October 31, 2008

Concord NC

Route
I 40 West, I 85 South and return

Notes
This was a quick shopping trip to Concord Mills along the I 85 corridor that I travel frequently.

There is no indication of sign changing on I 40/85/73 in Greensboro. The USRN meeting muddied this by referring to Future 73.

The construction at the I 74/US 311 interchange with I 85 continues apace. There is a new traffic pattern. The I 85 main lanes have been rerouted onto new C/D lanes which pass over new bridges over the I 74 main lanes. The east ramps for NC 62 connect to the C/D lanes. The close proximity of the NC 62 interchange with the new interchange is going to cause interleaving on the C/D lanes.

There is signage on I 85 for oversized truck detours between US 311 and US 64. The signs have two shields: one for I 85 Business and one for US 29/70, which have both numbers, one above the other, on one shield.

Results
None.

Tuesday, October 21, 2008

I 74 - Lumberton

Route
US 15/501 South, US 64 West, NC 87 South, NC 902 West, Local Road, US 421 West, US 1 South, US 15/501 South, US 74 Business West, I 74 East, US 74 Business Maxton East, US 74 Alternate East, NC 710 South, I 74 East, US 74 Alternate West, NC 710 North, NC 210 West, US 1 North, NC 78 East, NC 42 East, US 1/NC 42 Connector (US 421 Future) North, US 15/501 North

Notes
I 74/US 74 now connects to I 95. The current segment from Laurinburg to Lumberton runs from US 74 Business west of Laurinburg to NC 41, two exits east of I 95. NC DOT made an error in the mile markers on the segment from Laurinburg to NC 710. The segment from NC 710 to NC 41 is signed correctly, but several exit numbers on this segment duplicate the (incorrect) exit numbers on the western segment. NC DOT has covered over the exit numbers on the signs for the incorrectly numbered exits. It looks like they are going to fix it all, though it may take a while. From the interchange the east end of US 74 Alternate to NC 41, I 74/US74 is still being worked on. The main work is for widening of the shoulders. NC 41 needs to be resigned. Even though the road is not currently interstate standard, so that technically the road would be Future I 74, but there are some signs on the segment labelling it as full I 74, so, for all practical purposes, I 74 not runs to NC 41 and obviously ends there. US 74 continues on as non-interstate grade freeway (Future I 74).

The US 74 Alternate bridge over I 95 is closed for construction dealing with the removal of the I 95 interchange and connection to the new interchange with I 74/US 74. The westbound exit is open to US Alternate from I 74/US 74. However, there is a detour on the service drive of I 95 up to NC 71, west across I 95 and down the other service drive.

Results
Reclinch I 74 in NC. Clinch US 74 Business Laurinburg/Maxton, US 74 Alternate. Mileage on NC 710, NC 71, NC 210.

Monday, September 08, 2008

US 1/NC 42 Connector, Sanford


Route
US 15/501 South,US 1/NC 42 Connector (US 421 Future) South, NC 42 West, US 421 West, Cumnock Road North, local roads, NC 87 North, US 64 East, US 15/501 North

Notes
The future US 421 bypass is now open from NC 42 to US1/15/501/NC 87 north of Sanford. Neither end connects to US 421. From the US 1 freeway, the road is signed TO NC 42. On NC 42, the road is labeled as US 1/NC 42 Connector.

Where Cumnock Road crosses the Deep River, there is an old camelback trestle bridge that is in a small park. The bridge is well worth a stop. You can cross the bridge and see the construction detail. The planking sticks out from under the asphalt in places. There is a strange canoe/kayak launch beneath the bridge with a pair of steel pipe railings to slide your boat on next to a concrete steps that go down into the river.

Results
Reclinch US 421 Future.

Sunday, July 13, 2008

Augusta GA

Route
I 40 West, I 85 South, Bruton Smith Parkway, US 29 South, US 29 Connector, I 85 South, NC 16 North, I 485 South, I 85 North, Billy Graham parkway, US 74 East/West, I 85 South, US 29 South, I 85 South, I 85 Business, I 585 North, US 178 North, US 178 South, I 585 South, US 178 South, SC 49 West, I 26 South, SC 72 West, US 25 South, I 20 West to Augusta
GA 104 North, Ga 47 North, US 378 East, GA 79 North, GA 44 W/E to Wilkes County, GA 72 East, SC 72 East, SC 81 North, I 85 North, I 185 North, US 29 North, I 385 Business South, I 385 South, I 85 North, I 85 Business, I 85 North, US 221 North, US 74 East, I 85 North, NC 3 South, NC 49 North, US 65 East, US 15/501 North to Chapel Hill
Notes
I 485 north of I 85 is no longer signed Future. On NC 16, the first BGS for I 485 has "TO" over the I 485 shield, but the next BGS shows just the shield. The BGS for I 485 at US 74/29 labels the southbound lanes as both "OUTER" and "SOUTH", showing a little split personality.
I 585 is signed both north and south of I 85 Business in Spartanburg, but the freeway ends at the first exit north. The interstate should only go south or all the way to connect to I 85, eliminating the hanging I 585.

Results
Clinch I 495 (NC), I 585 (SC), I 395 Business Greenville, I 595 Business Spartanburg. Mileage on I 385, I 185, US 29, US 221, US 74, US 378, US 176 and NC 3, NC 16, SC 49, SC 72, SC 81, GA 104, GA 47, GA 79, GA 72, GA 44. Five counties: Union and Abbeville SC, Lincoln, Willkes and Elbert GA for a total of 906.

Monday, June 02, 2008

Carolinas Roadmeet, Cleveland NC

Route
NC 54 East, I 40 East, US 70 East, I 40 East, NC 42 West, NC 50 South, NC 210 East, I 40 West, NC 42 West
NC 42 East, Local Roads, US 70 Business West, US 70 West, NC 42 West
NC 42 East, I 40 West, NC 540 West, NC 55 North, Local Roads, NC 54 West
Notes
On the way to the roadmeet, I needed gas, so I took US 70/NC 50/US 401 to get gas at $3.85. When I got to the Cleveland Draft House, I had a little time to kill, so I went down NC 50 to McGhee's Crossroads to check out a BBQ restaurant and get a little more NC 210 mileage.
There is a BGS in error on US 70 East indicating that the I 40 West ramp is for US 70 West. This hearkens back to the early 1990's when US 70 went up I 40 and around the Beltline.
Smithfield is shown on a mileage sign on I 40 between US 70 and the new US 70 interchange. This is in preparation for when US 70 East will be routed there next week.
There is a US 70 reassurance shield on I 40 West north of the new interchange also in prep.
The BGS's on I 40 West for US 70 East now have covered banners for the change to Business.
The US 70 reassurance shields through Clayton all have covered Business banners.

We drove around looking at the new US 70 freeway from various dead ends. The first stop featured a dead cat in a shopping bag. A later dead end was for a busy road now permanently cut by the freeway. Between the Road Ends 1000 yards and 500 yards, there is a Speed Limit sign reducing the speed limit to 45 mph. At the dead end, right next to the barrier is a a Speed Limit sign restoring the 55 mph speed limit. If you can't speed up, you won't be able to make the jump across the freeway.
Results
Mileage on NC 210.

Wednesday, March 26, 2008

Painter Boulevard Southwest

Route
I 40 West, I 40 Business East, US 220 South, I 85 Business South, Groometown Road, I 40 East
Notes
First trip through the Maze. Westbound, I went directly on I 40/73. Coming back, I took the Grovetown exit to get another view of the bridges. Took a left across the Groometown bridge and left again onto the ramps for I 40/73/85. The rightmost ramp to I 40/73 is one long ramp.
Results
Reclinch I 40/73.

Wednesday, February 20, 2008

US 421 Bypass Future, Sanford

Route
US 15/501 South, local roads, US 421 Future West, US 421 Future East, NC 42 West, US 421 East, US 301 North, US 70 Business East, US 70 East, US 117 Alternate North, US 301 North, US 64 West, US 64 Business (Nashville) West, US 64 Alternate West, NC 98 West, US 1 South, I 540 West, I 40 East
Notes
The future US 421 bypass is open (though unsigned) from NC 42 to Colon Road north of Sanford. Neither end connects to US 421. The exits are numbered with US 421 mileage. At the Colon Road exit, there is a sign for the US 1 etc. interchange. It looks like that end is getting ready to open.
At the interchange for I 795 on US 70, the signs for the southbound ramps say US 117. The signs on the northbound ramps say US 117 and TO I 795. This interchange is the south end of I 795. Why does it say TO I 795?
NCDOT had said that they are taking US 117 off of the I 795 freeway and moving it back to current US 117 Alternate. There are no Alternate signs on US 117 Alternate. There used to be signs on US 301 directing US 117 Alternate onto US 264. It looks like US 117 Alternate has been shortened back to US 301. As the signs change, we will see what's going on.
There are new numbered exit signs on US 64 through Rocky Mount up to I 95.
Results
Clinch US 1117 Alternate, US 64 Business (Nashville), US 64 Alternate (Spring Hope). Mileage on US 421, US 301.

Tuesday, February 19, 2008

US 220 Reclinch

Route
US 15/501 South, US 64 West, Local Roads, US 220 Alt South, NC 705 North, US 220 South, US 220 Business Ellerbe North, US 220 Alt North, US 220 North, US 64 East, US 15/501 North
Notes
Old US 220 is still not resigned through Ellerbe and Norman. The only signs for US 22o Business are at the interchange. US 220 north of Norman has streets signs that say US 220 Alt, indicating that US 220 Alternate is being extended south, but the extent is unclear.
Results
Reclinch US 220.