Monday, November 14, 2005

Wilson Creek Backpacking Trip

Route
NC 86 North, I 40 West, US 64 East (Morganton), NC 181 North, Local Roads, NC 90 West to Wilson Creek
NC 90 East, Local Roads, US 64 East (Gameville), I-40 East, NC 86 South
Notes
NC 90 is a gravel road in the middle of the Wilson Creek wilderness. It is a real highway and is co-signed with US 64 in Lenoir and point east.
I 40 East has been diverted around the interchange being constructed for the west end of the Greensboro I 85/I 40 bypass, similar to the configuration on the east end of the bypass, where I 40/I 85 Business swerves under I 85 and merges from the right.
Results
Alexander County, NC, for a total of 883 counties.

Tuesday, November 08, 2005

Bedford County, VA

Route
I 40 West, US 70 Business East, NC 86 North, VA 86 North, US 29 North, VA 43 North, VA 24 East, US 501 South, NC 157 South to Durham
Notes
Results
Bedford County, VA, for a total of 882 counties.

Saturday, August 27, 2005

Augusta GA - August 2005

Route
I 40 West, Bus I 85 South, I 85 South, I 77 South, US 1 South, I 20 West to Augusta
GA 28, GA 104, Local Roads
I 20 East, SC 277 North, I 77 North, I 85 North, I 40 West to Chapel Hill
Notes
US 521 is still indicated on a BGS over I 77 at Billy Graham Parkway in south Charlotte NC.
The differential cost of gas is smaller between NC and Georgia. Unleaded was 2.49 in Haw River NC and 2.42 in Augusta GA. My brother told me that ever since Kenan bought out Smile gas, the Circle K gas stations are not pushing the price curve down.
Results

Sunday, August 14, 2005

US 64 Bypass

Route
NC 54 East, I 40 East, Harrison Road, NC 54 East, Western Boulevard, I 440 West, I 40 East, I 440 West, US 64 East to Business US 64 (Wendell)
US 64 West, I 440 West, I 40 West, NC 54 West
Notes
Rode the new freeway for the first time. Two interchanges, New Hope Road and I 540 are still under construction. The "End US 264" sign is the largest End sign I have ever seen.
Results

Wednesday, July 27, 2005

East Lansing MI July 2005

Route
From DTW Airport: I 94 West, M 52 North, I 96 West, US 127 North to East Lansing MI
M 43 East, Grand River Avenue, I 96 East (Brighton), Local Roads, I 94 East, I 75 North, Local Roads, M 53 West, Local Roads, I 696 West, I 96 East to Livonia
Local Roads, Grand River Avenue, I 96 West (Kent Lake), US 127 North to East Lansing
US 127 South, I 96 East, US 23 South, M 17 West to Ann Arbor
Local Roads, I 94 West to DTW Airport
Notes
Reacquaint self with some old roads: M 52 through Dexter MI and Stockbridge; Grand River Avenue through Williamston, Fowlerville, Howell, Novi, Milford.
Visited Marvin's Marvelous Mechanical Museum, which has been in the same locale for at least twenty five years. I first visited it when it was part of Tally Hall, a shopping area designed after Boston's Faneuill Hall. Tally Hall is entirely gone, the buildings are not standard strip malls, but Marvin's still lives on.
Results

Sunday, April 24, 2005

GA Tech April 2005

Route
NC 86 North, I 40 West, I 85 South, OH 140 West to Atlanta GA.
OH 141 South, I 285 East, I 85 South to GA Tech.
US 78 West, US 18 North, GA 13 North, I 85 North, US 23 North, GA 140 West.
GA 141 South, I 285 East, I 85 North, SC 11 East, SC 18 North, I 85 North, I 40 East, NC 86 South to Chapel Hill NC.
Notes
SC 11 is the "Cherokees Foothills National Scenic Highway" from the welcome center on North I 85 to I 85 in Gaffney SC. There is a great car themed restaurant in Chesnee SC on US 221 a few blocks south of SC 11 called the Bantam Chef. The place is decorated to mimic a 50s diner with road memorabilia covering the walls. It has a beautiful old Studebaker in a museum display like you see at the Henry Ford in Dearborn MI.
Results
Clinch SC 11.
One county for a total of 881.

Lansing MI April 2005

Route
Day 1. NC 86 North, I 40 West, Local Road, US 70 West, NC 87 North, US 29 North, NC 14 North, NC 87 North, VA 87 North, US 220 North, I 581 North, I 81 South, VA 419 South, US 460 West, US 11 South, VA 311 North, WV 311 North, VA 311 North, WV 311 North, I 64 West, US 60 West to Warm Springs VA, US 60 East, I 64 East to Covington VA, US 60 West, I 64 West, I 77 North to Mineral Wells WV
Day 2. I 77 North, OH 80 North, OH 37 West, OH 13 North, I 70 West, I 294 South, US 23 North, I 294 West, OH 315 North, US 23 North, OH 15 West, I 75 North, Ohio Turnpike West, OH 96 North, US 127 North to East Lansing MI
Local Roads around Lansing/East Lansing including Bus 69, MI 43, US 127
Day 3. US 127 South, I 96 East to Livonia MI
Day 4. I 275 South, US 24 South, I 75 South, I 475 West, I 75 South, US 15 East, US 23 South, US 30 East, I 71 South, OH 36 East, OH 83 South, I 70 East, I 77 South, US 460 West to Princeton WV
Day 5. US 460 West to Bluefield VA, US 19 East, US 460 West, US 52 South, Blue Ridge Parkway North, US 58 East, NC 86 South to Chapel Hill
Notes
On VA 311 there is a odd double tunnel with one span stone and one span corrugated steel culvert.
In Blufield VA, US 19 through town is signed both US 19 and US 460 with old cutout shields. In Blufield WV, the US 460 designation is dropped and the shields become modern shields. VA also uses old cutouts along US 52 in several small towns.
The I-73 corridor is signed along US 220 south of Roanoke VA and along US 460 between Princeton and Bluefield WV.
OH 83 and OH 37 run through oil country with working wells right next to the road.
In downtown Columbus, there are multiple signs to OH 315 from US 23, even one that looks like OH 315 is multiplexed with US 30, but OH 315 parallels US 23 and they never cross.
Results
Seventeen counties for a total of 880.
In Virginia, clinch VA 311, US 52 and I 581.
In West Virginia, clinch US 460 and WV 311.
In Ohio, clinch US 23 and OH 315.
In Michigan, clinch US 24 and US 127.

Thursday, March 31, 2005

Clinching NC 62 and US 311

Route
NC 86 North, I 40 West, Future I 840 North, US 70 West, US 220 North, Local Roads
US 220 South, NC 62 West, NC 109 North, Business I 85 South, US 52 North, NC 8 South, Business I 85 North, NC 109 North, US 311 South, Business I 85 North, I 85 North, NC 54 East
Notes
The I 85 Bypass of Greensboro is open again.
There are detour signs for US 29 North and US 70 West from I 40/85 onto Future I 840. This has been for construction at the NC 6 and US 29 North interchange. Since I was headed into Greensboro, I followed them. However, I did not notice any more detour signs on Future I 840 or on US 70 West.
US 311 South has Future I 74 Corridor signs south of I 40. There are none on the new bypass of High Point, which definitely is meant to be I 74.
Since the bypass was built, I no longer had US 311 clinched.
Results
Clinch NC 62 and reclinch US 311.

Monday, March 14, 2005

Augusta GA - A family funeral

Route
I 40 West, Bus I 85 South, I 85 South, I 77 South, SC 277 South, I 20 West to Augusta
GA 28, GA 104, Local Roads
I 20 East, SC 277 North, I 77 North, I 485 East, I 85 North, Bus I 85 North, I 40 West to Chapel Hill
Notes
Exit 149 on I 85 is now open as University Drive to Elon. Elon has been removed from the exit 141 signs. This may cause a problem with truckers who have notes regarding the Elon exit on I 85/I 40.
I 485 West is still marked on the GBS on I 77 South and North as Future I 485.
There is the 44 Motel at exit 44 on I 20 in SC. There are businesses named after highways. How many are named after exit numbers?
The rest area at mile 63 on I 77 in SC used to have payphones with large signs saying "Chester" because they were served by the Chester Telephone Company. Now they just say "Sprint". A bit of local color has disappeared.
Results

Tuesday, March 08, 2005

Lansing MI

Route
NC 86 North, I 40 West, Bus 40 West, US 52 North, I 74 West, I 77 North, Ohio Turnpike West, US 23 North, I 96 West
Side Trip - I 96 West, I 69 South, Bus 69 South (Charlotte) and return
Local Roads - I 496, Bus 69 (Lansing), Bus 96, M 43
Return - I 96 East, US 23 South, I 75 South, OH 15 East, US 23 South, I 270 West, OH 315 South, I 71 South, I 270 East, US 23 South, US 35 East, I 64 East, I 77 South, I 74 East, US 52 South, Bus 40 East, I 40 East, NC 86 South

Notes
I 85 is blocked with barricades on the ramp from I 40/I 85 West east of Greensboro. Construction through Canton OH is done.
The turnpike plazas just east of Toledo OH look about ready to open.
There is no weather info in the turnpike plazas. My brother the trucker talked to another trucker to get info about conditions farther up into the snow storm.
Took the new US 35 freeway from US 50 to Richmond Dale OH. There are stubs of pavement from the old US 35 carriageway.

Results
Clinched I 69 completely.

Monday, February 14, 2005

Chatham County Trip

Route
Old Greensboro Highway West, NC 49 South, local road, US 421 South, US 64 West, Old US 421 South, NC 902 West, Local Roads, NC 42 East, US 421 West, NC 902 East, Local Road, US 64 East, US 15/501 North

Notes
My trips crisscrossing central North Carolina have covered many of the counties. I have clinched the state and US highways in Orange, Durham, Person and Granville counties. The only highways in Chatham county that I had not clinched (in the county) were US 421 and NC 42. My travels tend to cross these roads, but not travel along them. Since business took me to southwest Chatham county, I turned it into a roadtrip to cover those roads, at least in southwest Chatham county.

US 421 is being upgraded to four lane divided from Sanford to Goldston. The bypass around Goldston is a Super-2, but not for long.

Results
The only state highway left to clinch Chatham county is NC 42 from Corinth east.

Monday, December 27, 2004

Xmas in Georgia; Visit to GA Tech

Route
I 40 West, I 85 South, I 77 South, US 1 South, I 20 West to Augusta
GA 28, GA 104, I 520, GA 383, Local Roads
I 20 West, I 75/85 North to GA Tech
Local Roads, I 75 South, I 285 East, I 20 West to Augusta
I 20 East, SC 144 North, US 25 North, US 378 East, SC 39 North, SC 56 North, SC 72 East, I 26 West, I 85 North, I 40 West to Chapel Hill
Notes
Exit 149 on I 85 is now open as University Drive to Elon. Elon has been removed from the exit 141 signs.
When the HOV lane on I 77 South ends, the lane ends and you have to merge right.
I 485 West is still marked on the GBS on I 77 South as Future I 485
I 485 South has Rock Hill as its control city from I 85 South and Pineville as its control city from I 85 North.
Results
One County (Saluda SC), for a total of 863

Monday, December 06, 2004

Mount Rogers

Route
I 40 West, Bus I 40 West, US 52 North, I 74 West, I 77 North, US 52 West, VA 600 North
Notes
Previously, we went to Mount Rogers by way of Sparta NC, but this way is faster.
All lanes are open on I 85/I 40 at the bridge construction at Mile 140 west of Burlington NC, eliminating a bottle neck.
All lanes are open on Business I 40 from Kernersville NC to US 52.
Galax VA is one of smallest Independant Cities in Virginia. I had both of the counties that Galax is between, but not Galax.
In Greensboro NC, the BGSs on Eastbound I 40/Bus 85/US 421 at US 220 and Bus 85 do not mention I 85 at all now. You have to know that to get to I-85 South, you take Bus 85 South or go all the way to the I 40/I 85 split east of Greensboro.
Results
Picked up mileage on US 58. One county (Galax VA) for a total of 861.

Wednesday, November 10, 2004

Clinch US 220 in NC

Route
I 40 West, NC 87 North, US 158 West, US 220 North, US 220 Business, NC 135 East, US 220 North, VA 87 South, NC 87 South, US 158 East, US 29 Bypass South, NC 150 East, US 158 East, NC 86 South
Notes
My NC State Highway Map shows US 311 going through Madison on US 220 Business and NC 135 East to Eden. I took the detour to see for myself. There is an End sign at US 311 and US 220 Business as before. The new route has not been signed.
US 220 is signed as Future I 73 Corridor in both North Carolina and Virginia.
US 28 Bypass has had its mileposts renumbered. The exits show the old exit numbers and new exit numbers, differing only by a mile or two. What was the point?
Results
Clinch US 220 in NC, VA 87

Wednesday, October 27, 2004

Sandhills

Route
US 15/501 South, US 1 South, US 15/501 South, US 15/401 South, SC 381 West, NC 381 West, NC 79, NC 381 West, US 74 Business West, NC 38 South, Local Roads, US 1 N to NC 177
US 1 South, US 220 North, US 220 Alt North, NC 705, US 220 Alt North, NC 159 North, Local Roads, NC 42 East, NC 22 North, NC 62 East, US 421 North, I 40 East, I 840 North, US 70 East, I 40 East
Notes
Construction continues at a snail's pace on US 15/501 from Chapel Hill to Pittsboro and the US 1 Vass Bypass.
Crossed the South Carolina border on US 15, NC 75 and US 1. On each there are several dead Video Poker parlors. They look pathetic.
Lots of construction south of Candor on the US 220/I 73/I 74 extension to Rockingham. Nice view of bridge construction west of US 220.
The only exit on Future I 840 is numbered 19, which should count around the future loop from the other end at current I 40.
Results
Clinched US 1, US 15, NC 381, NC 38, NC 705, NC 159, NC 22. Almost clinched US 220, need the northern end.
Photographed NC 79 Southern Terminus and NC 177 Northern Terminus

Saturday, October 23, 2004

College Visit to JHU

Route
US 15/501 North, I 85 North, I 95 North, I 295 (Md/DC) North, DC 295 North, Baltimore-Washington Parkway North, MD 295, Local Roads to JHU
Local Roads, I 83 South, Local Roads, I 395 South, I 95 South, VA 7100 South, US 1 South to Stafford, I 95 South, I 85 South, US 15/501 South to Chapel Hill
Notes
Going north, no delays at Springfield or the Woodrow Wilson Bridge. Night construction is going on the Virginia approach to the bridge.
The Balitmore-Washington Parkway is a strange duck. It is signed like the Blue Ridge Parkway or the Jamestown/Yorktown Parkway , but appears just to be a highway connecting government complexes and the cities.
Going south, significant delays at the Woodrow Wilson Bridge from both directions. However, once you hit the bridge, traffic went to highway speed.
The BGS north of Richmond illustrating that I-295 goes around Richmond has got to be the stupidest BGS in the southeast.
Results
Clinch I 95, I 295, DC 295, I 495 in DC
Clinch I 295, Baltimore-Washington Parkway, MD 295, I 395 in MD
5 counties in MD, total now 858

Sunday, October 10, 2004

Shenandoah National Park

Route
NC 86 North, I 29 North, VA 6 West, VA 151 North, US 250 West to the Skyline Drive
Notes
There is construction of the Sweetbrier interchange at the south end of Amherst bypass, US 29 reduced to both directions on one carriageway. This is the north end of the US 29 bypass of Lynchburg from the existing US 460 freeway.
US 29 has two names, "Seminole Trail", which hearkens back to when roads were named, and "The 29th Infantry Division Memorial Highway".
There is a very tall water spout on the James River west of the US 29 bridge. The US-29 freeway through Lynchburg is awful. Someday I am going to figure out how to get through Lynchburg without hitting the section of US 29 in front of Walmart. Supposedly, taking US 460 to US 501 is better.
A new entrance to the National Park is being built a little south of the current one. The road, curbing and foundation is in. There is parking in both driections, making getting backcountry permits a little easier, if they move the backcountry permit box to the new entry way.
On some bridge north of Lynchburg, I saw little signs "Lift Blade at Joint". It took a little thinking to realize that these were for snowplows to lift their blades over the bridge joints.
Virginia's secondary roads (round signs) appear to number up into the 1000's. I did see one in the 9000's and one which was numbered "F287", which I assume is a farm road.
Shenandoah National Park is beautiful in October. On our way out, there was a line of cars at the entranceway.
There is a small green "Future I 785 Corridor" sign on US 29 S/US 58 W just west of the interchange with US 58 E. This indicates that I 785 will extend around Danville, at least to US 58 W. Continuing around on the US 29 Bypass would make sense.
Results
Picked up mileage on VA 6, VA 151 and US 250.

Friday, October 08, 2004

Clinch NC 96

Route
I 40 East, US 70 East, US 70 Bus East, NC 96 South, NC 55 East, I 40 West, I 95 North, US 70 Bus West, NC 96 North, US 158 West, I 85 South to Durham NC
Notes
Due to misreading a map, I started out heading for Smithfield to explore the various US 70's there and then head north on NC 96, which I thought ended at US 301 in Selma. When I got to the intersection of US 70 Bus and US 301, I was surprised to see the NC-96 was multiplexed with US 301. Looking at the map, NC 96 continued to NC 55. Oops. I should have taken I 40 to NC 55 in the first place. The US 70's will have to wait.
NC 96 runs through a lot of cotton fields from NC 55 to Zebulon.
Results
Clinched NC 96.
Extended the central section of US 158 around Oxford. I need to connect US 158 from I 85 to the exit north of Henderson to have US 158 continuous from Merchant Millpond to Reidsville.

Sunday, September 26, 2004

Drive the U-Haul from Dearborn MI to Chapel Hill NC

Route
US 24 South, I 94 West, I 275 South, I 75 South, I 280 South, I 80/90/Ohio Turnpike East, I 77 South, I 74 East, US 52 South, I 40 Bus East, I 40 East, NC 86 South to Chapel Hill NC
Notes
In a truck, stick to Interstates.
The interchange between US 24 and I 94 is under reconstruction into a SPUI. The unusual left exits from I 94 are gone and the bridges that carried them across US 24 are gone. Currently there is a detour for both exits.
The southern approaches to the new I 280 bridge look complete.
In the new Ohio Turnpike service areas, the diesel pumps are before the truck parking area. You have to fuel first.
Ohio Turnpike treats the truck as a car. West Virginia calls it a Class 5 vehicle with a $2.00 toll per plaza.
Results

Thursday, July 22, 2004

College Visit to VPI and CMU

Route

NC 86 North, US 58 West, VA 8 North, I 81 North, US 460 West to VA Tech
US 460 West, I 77 North, US 19 North, I 79 North, I 279 North, I 376 East to Carnegie-Mellon
I 579 North, I 279 South. I 79 South, US 19 South, I 77 South, I 74 East, US 52 South, I 40 East, US 220 South, I 85 East, I 40 East, NC 86 South to Chapel Hill NC

Notes

The 2004-6 Virginia map still shows the Danville and Stuart bypasses as being under construction. I know that the Danville bypass opened this spring, but the Stuart bypass has been done for a while.

On US-460 between Christiansburg and Blacksburg are BGS’s and exits for Smart Road support facilities.

US 460 is in the I 73 corridor. It would not take too much to upgrade it to Interstate.

US-19 is signed as the “Robert C. Byrd Appalachian Highway System”. It appears to be interstate grade except between Summersville and the New River Gorge.

The mess of construction on the I-279 bridge over the Mon is almost all complete.

When leaving the Pitt campus area, there are ramps for both I 279 and I 579. The ramp for I 579 is over the other following the river, when it takes a right turn downtown and becomes the interstate proper.

There is no ramp from I 579 N onto I 279 S. You have to find an exit and make a U-turn.

US-52 is marked “Future I-74 Corridor” into Winston-Salem, even past where the I-74 bypass is supposed to leave US-52.

I-74 and I-73 are signed as such on I-74 and US-220 where the road is interstate grade. If the road is not interstate grade, the route is sighed with a “Future I-7X Corridor” or with Future I-7X shields. Is there a reason for the two different signages?

US-220 between I-40 and I-85 is sighed with Future I-73 shields, even though I-73 is now to be routed along the to be built new I-40.

On I-85 just east of US-220, there is a I-40/I-85 shield pair. Not “TO I-40”. This is jumping the gun by years.

Results

Clinched I-279, I-579 in Pennsylvania
10 counties, 2 in VA, 2 in PA, 6 in WV, total now 853